Incorporating the Progress Measurement Dimension to An Integrated Building Information System: A research framework

  • Xiaonan Zhang (Speaker)
  • N. Bakis (Speaker)
  • Song Wu (Speaker)
  • Michail Kagioglou (Speaker)
  • Ghassan F. Aouad (Speaker)
  • Timothy C. Lukins (Speaker)
  • Yahaya M. Ibrahim (Speaker)

Activity: Talk or presentation typesOral presentation

Period26 Jun 2007
Event title24th CIB W78 Conference
Event typeConference
Conference number24
LocationMaribor, Slovenia
Degree of RecognitionInternational