Incorporating the Progress Measurement Dimension to An Integrated Building Information System: A research framework

Xiaonan Zhang (Speaker), N. Bakis (Speaker), Wu, S. (Speaker), Kagioglou, M. (Speaker), Ghassan F. Aouad (Speaker), Timothy C. Lukins (Speaker), Yahaya M. Ibrahim (Speaker)

Activity: Talk or presentation typesOral presentation

Period26 Jun 2007
Held at24th CIB W78 Conference
Event typeConference
LocationMaribor, Slovenia
Degree of RecognitionInternational