5mw power upgrade studies of the ISIS TS1 target

Cristian Bungau, Adriana Bungau, Robert Cywinski, Thomas Robert Edgecock, Christopher Neal Booth, Lei Zang

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

The increasing demand for neutron production at the ISIS neutron spallation source has motivated a study of an upgrade of the production target TS1. This study focuses on a 5 MW power upgrade and complete redesign of the ISIS TS1 spallation target, reflector and neutron moderators. The optimisation of the target-moderator arrangement was done in order to obtain the maximum neutron output per unit input power. In addition, at each step of this optimisation study, the heat load and thermal stresses were calculated to ensure the target can sustain the increase in the beam power.

Original languageEnglish
Title of host publication6th International Particle Accelerator Conference, IPAC 2015
PublisherJoint Accelerator Conferences Website (JACoW)
Pages3253-3255
Number of pages3
ISBN (Electronic)9783954501687
Publication statusPublished - 2015
Event6th International Particle Accelerator Conference - Thomas Jefferson National Acceleration Facility, Richmond, United States
Duration: 3 May 20158 May 2015
Conference number: 6

Conference

Conference6th International Particle Accelerator Conference
Abbreviated titleIPAC 2015
Country/TerritoryUnited States
CityRichmond
Period3/05/158/05/15

Fingerprint

Dive into the research topics of '5mw power upgrade studies of the ISIS TS1 target'. Together they form a unique fingerprint.

Cite this