Abstract

Purpose:
The purpose of this paper is to explore the benefits of Visual Management (VM) systems in transportation construction projects in England.

Design/methodology/approach:
Following a comprehensive literature review, the benefits of VM were investigated through action and case study research executed within two construction projects in England.

Findings:
The main findings are; VM can contribute to (i) increased self-management, (ii) better team coordination, (iii) better promises or an increasing Plan Percent Complete (PPC), (iv) easier control for the management, and (v) improved workplace conditions in the transportation sector. It is important for the management to obtain the engagement of their workforce for VM through increased participation and demonstrating the actual benefits. However, managerial monitoring and control on the systems should not be underestimated.

Originality/value:
The transportation sector in England has been systematically deploying lean construction techniques in its operations for a while. One of those lean techniques is a close-range visual communication strategy called Visual Management (VM). The literature on the VM implementation in construction is scarce and generally limited to the building construction context. This paper documents the benefits of VM systems for the transportation sector by using data captured through both qualitative and quantitative data collection methods. The paper also identifies a set of recommendations for similar research efforts in the transportation context in the future.
Original languageEnglish
Pages (from-to)125-157
Number of pages33
JournalConstruction Innovation
Volume17
Issue number2
DOIs
Publication statusPublished - 15 Apr 2017
Externally publishedYes

Fingerprint

Visual communication
Monitoring

Cite this

@article{15c14fbd31df4330bff9b2b5611f86e2,
title = "Benefits of Visual Management in Construction: Cases from the Transportation Sector in England",
abstract = "Purpose:The purpose of this paper is to explore the benefits of Visual Management (VM) systems in transportation construction projects in England.Design/methodology/approach:Following a comprehensive literature review, the benefits of VM were investigated through action and case study research executed within two construction projects in England.Findings:The main findings are; VM can contribute to (i) increased self-management, (ii) better team coordination, (iii) better promises or an increasing Plan Percent Complete (PPC), (iv) easier control for the management, and (v) improved workplace conditions in the transportation sector. It is important for the management to obtain the engagement of their workforce for VM through increased participation and demonstrating the actual benefits. However, managerial monitoring and control on the systems should not be underestimated.Originality/value: The transportation sector in England has been systematically deploying lean construction techniques in its operations for a while. One of those lean techniques is a close-range visual communication strategy called Visual Management (VM). The literature on the VM implementation in construction is scarce and generally limited to the building construction context. This paper documents the benefits of VM systems for the transportation sector by using data captured through both qualitative and quantitative data collection methods. The paper also identifies a set of recommendations for similar research efforts in the transportation context in the future.",
keywords = "England, benefits, visual management, lean construction, process transparency, transportation sector",
author = "Algan Tezel and Zeeshan Aziz",
note = "Embargo removed from ePrints 11/10/17 as per Emerald's new policies [JC]",
year = "2017",
month = "4",
day = "15",
doi = "10.1108/CI-05-2016-0029",
language = "English",
volume = "17",
pages = "125--157",
journal = "Construction Innovation",
issn = "1471-4175",
publisher = "Arnold",
number = "2",

}

Benefits of Visual Management in Construction : Cases from the Transportation Sector in England. / Tezel, Algan; Aziz, Zeeshan.

In: Construction Innovation, Vol. 17, No. 2, 15.04.2017, p. 125-157.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Benefits of Visual Management in Construction

T2 - Cases from the Transportation Sector in England

AU - Tezel, Algan

AU - Aziz, Zeeshan

N1 - Embargo removed from ePrints 11/10/17 as per Emerald's new policies [JC]

PY - 2017/4/15

Y1 - 2017/4/15

N2 - Purpose:The purpose of this paper is to explore the benefits of Visual Management (VM) systems in transportation construction projects in England.Design/methodology/approach:Following a comprehensive literature review, the benefits of VM were investigated through action and case study research executed within two construction projects in England.Findings:The main findings are; VM can contribute to (i) increased self-management, (ii) better team coordination, (iii) better promises or an increasing Plan Percent Complete (PPC), (iv) easier control for the management, and (v) improved workplace conditions in the transportation sector. It is important for the management to obtain the engagement of their workforce for VM through increased participation and demonstrating the actual benefits. However, managerial monitoring and control on the systems should not be underestimated.Originality/value: The transportation sector in England has been systematically deploying lean construction techniques in its operations for a while. One of those lean techniques is a close-range visual communication strategy called Visual Management (VM). The literature on the VM implementation in construction is scarce and generally limited to the building construction context. This paper documents the benefits of VM systems for the transportation sector by using data captured through both qualitative and quantitative data collection methods. The paper also identifies a set of recommendations for similar research efforts in the transportation context in the future.

AB - Purpose:The purpose of this paper is to explore the benefits of Visual Management (VM) systems in transportation construction projects in England.Design/methodology/approach:Following a comprehensive literature review, the benefits of VM were investigated through action and case study research executed within two construction projects in England.Findings:The main findings are; VM can contribute to (i) increased self-management, (ii) better team coordination, (iii) better promises or an increasing Plan Percent Complete (PPC), (iv) easier control for the management, and (v) improved workplace conditions in the transportation sector. It is important for the management to obtain the engagement of their workforce for VM through increased participation and demonstrating the actual benefits. However, managerial monitoring and control on the systems should not be underestimated.Originality/value: The transportation sector in England has been systematically deploying lean construction techniques in its operations for a while. One of those lean techniques is a close-range visual communication strategy called Visual Management (VM). The literature on the VM implementation in construction is scarce and generally limited to the building construction context. This paper documents the benefits of VM systems for the transportation sector by using data captured through both qualitative and quantitative data collection methods. The paper also identifies a set of recommendations for similar research efforts in the transportation context in the future.

KW - England

KW - benefits

KW - visual management

KW - lean construction

KW - process transparency

KW - transportation sector

UR - http://www.emeraldinsight.com/loi/ci

U2 - 10.1108/CI-05-2016-0029

DO - 10.1108/CI-05-2016-0029

M3 - Article

VL - 17

SP - 125

EP - 157

JO - Construction Innovation

JF - Construction Innovation

SN - 1471-4175

IS - 2

ER -