It has been realised through research and practice that lean construction and Building Information Modelling (BIM) have significant synergies, and can bring benefits if implemented together. VisiLean has been developed as research software, which provides integration between the lean workflow and the BIM model, enabling simultaneous visualisation of the product and process model. VisiLean supports the Last Planner™ workflow, and is aimed to be used by the construction teams on projects. The main purpose of the research is to partially evaluate the findings from a brief pilot project, where VisiLean was implemented on an infrastructure project. Through this paper the authors wish to highlight the challenges and opportunities that were identified during the pilot implementation. Specific challenges were encountered pertaining to the level of detail, and the parametric nature (or the lack thereof) of the existing Building Information Model of the project. Also, issues were identified regarding the synchronisation of the lean workflow with the BIM model. Overall however, the project team perceived the integration of Lean and BIM through VisiLean positively. As the implementation of lean and BIM is relatively new to infrastructure projects, the findings are of importance to potential lean and BIM implementers in the infrastructure field. However, on a broad level the findings are of interest to those in the construction industry wishing to implement Lean and BIM on projects.

LanguageEnglish
Title of host publication21st Annual Conference of the International Group for Lean Construction 2013, IGLC 2013
PublisherThe International Group for Lean Construction
Pages741-750
Number of pages10
ISBN (Print)9781632660183
Publication statusPublished - 1 Jan 2014
Externally publishedYes
Event21st Annual Conference of the International Group for Lean Construction - Fortaleza, Brazil
Duration: 29 Jul 20132 Aug 2013
Conference number: 21

Conference

Conference21st Annual Conference of the International Group for Lean Construction
Abbreviated titleIGLC'13
CountryBrazil
CityFortaleza
Period29/07/132/08/13

Fingerprint

Construction industry
Synchronization
Visualization

Cite this

Dave, B., Boddy, S., & Koskela, L. (2014). Challenges and opportunities in implementing lean and BIM on an infrastructure project. In 21st Annual Conference of the International Group for Lean Construction 2013, IGLC 2013 (pp. 741-750). The International Group for Lean Construction.
Dave, Bhargav ; Boddy, Stefan ; Koskela, Lauri. / Challenges and opportunities in implementing lean and BIM on an infrastructure project. 21st Annual Conference of the International Group for Lean Construction 2013, IGLC 2013. The International Group for Lean Construction, 2014. pp. 741-750
@inproceedings{a9c23ee741bc4f84990675a05997edef,
title = "Challenges and opportunities in implementing lean and BIM on an infrastructure project",
abstract = "It has been realised through research and practice that lean construction and Building Information Modelling (BIM) have significant synergies, and can bring benefits if implemented together. VisiLean has been developed as research software, which provides integration between the lean workflow and the BIM model, enabling simultaneous visualisation of the product and process model. VisiLean supports the Last Planner™ workflow, and is aimed to be used by the construction teams on projects. The main purpose of the research is to partially evaluate the findings from a brief pilot project, where VisiLean was implemented on an infrastructure project. Through this paper the authors wish to highlight the challenges and opportunities that were identified during the pilot implementation. Specific challenges were encountered pertaining to the level of detail, and the parametric nature (or the lack thereof) of the existing Building Information Model of the project. Also, issues were identified regarding the synchronisation of the lean workflow with the BIM model. Overall however, the project team perceived the integration of Lean and BIM through VisiLean positively. As the implementation of lean and BIM is relatively new to infrastructure projects, the findings are of importance to potential lean and BIM implementers in the infrastructure field. However, on a broad level the findings are of interest to those in the construction industry wishing to implement Lean and BIM on projects.",
keywords = "BIM, Infrastructure, Lean and BIM, Lean construction, Product and process visualisation",
author = "Bhargav Dave and Stefan Boddy and Lauri Koskela",
year = "2014",
month = "1",
day = "1",
language = "English",
isbn = "9781632660183",
pages = "741--750",
booktitle = "21st Annual Conference of the International Group for Lean Construction 2013, IGLC 2013",
publisher = "The International Group for Lean Construction",

}

Dave, B, Boddy, S & Koskela, L 2014, Challenges and opportunities in implementing lean and BIM on an infrastructure project. in 21st Annual Conference of the International Group for Lean Construction 2013, IGLC 2013. The International Group for Lean Construction, pp. 741-750, 21st Annual Conference of the International Group for Lean Construction, Fortaleza, Brazil, 29/07/13.

Challenges and opportunities in implementing lean and BIM on an infrastructure project. / Dave, Bhargav; Boddy, Stefan; Koskela, Lauri.

21st Annual Conference of the International Group for Lean Construction 2013, IGLC 2013. The International Group for Lean Construction, 2014. p. 741-750.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

TY - GEN

T1 - Challenges and opportunities in implementing lean and BIM on an infrastructure project

AU - Dave, Bhargav

AU - Boddy, Stefan

AU - Koskela, Lauri

PY - 2014/1/1

Y1 - 2014/1/1

N2 - It has been realised through research and practice that lean construction and Building Information Modelling (BIM) have significant synergies, and can bring benefits if implemented together. VisiLean has been developed as research software, which provides integration between the lean workflow and the BIM model, enabling simultaneous visualisation of the product and process model. VisiLean supports the Last Planner™ workflow, and is aimed to be used by the construction teams on projects. The main purpose of the research is to partially evaluate the findings from a brief pilot project, where VisiLean was implemented on an infrastructure project. Through this paper the authors wish to highlight the challenges and opportunities that were identified during the pilot implementation. Specific challenges were encountered pertaining to the level of detail, and the parametric nature (or the lack thereof) of the existing Building Information Model of the project. Also, issues were identified regarding the synchronisation of the lean workflow with the BIM model. Overall however, the project team perceived the integration of Lean and BIM through VisiLean positively. As the implementation of lean and BIM is relatively new to infrastructure projects, the findings are of importance to potential lean and BIM implementers in the infrastructure field. However, on a broad level the findings are of interest to those in the construction industry wishing to implement Lean and BIM on projects.

AB - It has been realised through research and practice that lean construction and Building Information Modelling (BIM) have significant synergies, and can bring benefits if implemented together. VisiLean has been developed as research software, which provides integration between the lean workflow and the BIM model, enabling simultaneous visualisation of the product and process model. VisiLean supports the Last Planner™ workflow, and is aimed to be used by the construction teams on projects. The main purpose of the research is to partially evaluate the findings from a brief pilot project, where VisiLean was implemented on an infrastructure project. Through this paper the authors wish to highlight the challenges and opportunities that were identified during the pilot implementation. Specific challenges were encountered pertaining to the level of detail, and the parametric nature (or the lack thereof) of the existing Building Information Model of the project. Also, issues were identified regarding the synchronisation of the lean workflow with the BIM model. Overall however, the project team perceived the integration of Lean and BIM through VisiLean positively. As the implementation of lean and BIM is relatively new to infrastructure projects, the findings are of importance to potential lean and BIM implementers in the infrastructure field. However, on a broad level the findings are of interest to those in the construction industry wishing to implement Lean and BIM on projects.

KW - BIM

KW - Infrastructure

KW - Lean and BIM

KW - Lean construction

KW - Product and process visualisation

UR - http://www.scopus.com/inward/record.url?scp=84903291737&partnerID=8YFLogxK

UR - http://www.proceedings.com/21515.html

M3 - Conference contribution

SN - 9781632660183

SP - 741

EP - 750

BT - 21st Annual Conference of the International Group for Lean Construction 2013, IGLC 2013

PB - The International Group for Lean Construction

ER -

Dave B, Boddy S, Koskela L. Challenges and opportunities in implementing lean and BIM on an infrastructure project. In 21st Annual Conference of the International Group for Lean Construction 2013, IGLC 2013. The International Group for Lean Construction. 2014. p. 741-750