Activities per year
Abstract
The Last Planner system has been widely implemented seeking to offer greater transparency and predictability for construction projects through collaborative production planning. A major challenge in this context is increasing process transparency, which is one of the visual management (VM) purposes and a basic principle of the Lean production philosophy. Achieving this has required extrapolating the limits of the physical environment through the use of digital tools, which lead to the digitalization of VM and to virtual collaboration. This process was accelerated due to the COVID-19 context, the physical boundaries constraints, and the need for real-time information sharing and collaboration. This paper aims to explore and discuss the use of digital VM tools for LPS implementation. Action research was the methodological approach adopted in this research. The investigation was based on a consultancy in a construction company in Brazil. The digital VM tools and practices adopted in the different planning levels were assessed through requirements considered relevant to this context, including visual and non-visual aspects. Their impact in collaborative production planning is discussed. The ongoing results indicate that digital tools were better suited to the strategic and tactical levels, while traditional tools showed more suitable for the operational level.
| Original language | English |
|---|---|
| Title of host publication | Proceedings of the 30th Annual Conference of the International Group for Lean Construction (IGLC30) |
| Publisher | The International Group for Lean Construction |
| Pages | 645-656 |
| Number of pages | 12 |
| DOIs | |
| Publication status | Published - 1 Aug 2022 |
| Event | 30th Annual Conference of the International Group for Lean Construction - Edmonton, Canada Duration: 25 Jul 2022 → 31 Jul 2022 Conference number: 30 https://iglc2022.com/ https://iglc.net/Content/Proceedings/IGLC-2022-Proceedings.pdf |
Publication series
| Name | Proceedings of the Annual Conference of the International Group for Lean Construction |
|---|---|
| Publisher | International Group for Lean Construction (IGLC) |
| ISSN (Print) | 2309-2979 |
| ISSN (Electronic) | 2789-0015 |
Conference
| Conference | 30th Annual Conference of the International Group for Lean Construction |
|---|---|
| Abbreviated title | IGLC 2022 |
| Country/Territory | Canada |
| City | Edmonton |
| Period | 25/07/22 → 31/07/22 |
| Internet address |
Fingerprint
Dive into the research topics of 'Exploring the Use of Digital Visual Management for Last Planner System Implementation'. Together they form a unique fingerprint.Activities
- 1 Oral presentation
-
Exploring the Use of Digital Visual Management for Last Planner System Implementation
Conte, M. (Speaker), Trentin, B. (Contributor to Paper or Presentation), Pedo, B. (Contributor to Paper or Presentation), Bernardo Martim Beck Da Silva, E. (Contributor to Paper or Presentation) & Navarrete, S. (Contributor to Paper or Presentation)
Jul 2022Activity: Talk or presentation types › Oral presentation
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver