Abstract
This research investigates the interfaces, flows, and problems of construction supply chains in the infrastructure sector. The discussion focuses on how construction companies should manage different interfaces between suppliers and project sites, not only from a temporary project perspective but also from a long-term enterprise viewpoint. Such interfaces are studied according to the flows of information, capital, and materials connecting the different parties in supply chains. In this context, a framework comprising interfaces and flows is developed. Based on such framework, problems of construction supply chains are identified and positioned accordingly. Therefore, the main purpose of this paper is to develop and implement a framework for addressing interfaces, flows, and problems of construction supply chains. This underlying research was developed in a Brazilian contractor, responsible for infrastructure projects such as tunnelling, earthworks, and highways construction. In addition, eleven of its suppliers were included in the empirical investigation. Data has been collected in semi-structured interviews, meetings, collection and analysis of documents, observation of meetings, workshops, site visits, and from the company's ERP database. It was found a lack of awareness regarding the existence of the abovementioned supply chains' interfaces and flows, the root causes of supply chain problems, and the implications of supply chain issues in project delivery. This research has two limitations: was developed in the context of infrastructure projects and investigates a single case-study. Implications from this paper are directed to the research field of frameworks for managing construction supply chains.
Original language | English |
---|---|
Title of host publication | 22nd Annual Conference of the International Group for Lean Construction |
Subtitle of host publication | Understanding and Improving Project Based Production, IGLC 2014 |
Publisher | The International Group for Lean Construction |
Pages | 1095-1106 |
Number of pages | 12 |
Publication status | Published - 2014 |
Externally published | Yes |
Event | 22nd Annual Conference of the International Group for Lean Construction: Understanding and Improving Project Based Production - Oslo, Norway Duration: 25 Jun 2014 → 27 Jun 2014 Conference number: 22 |
Conference
Conference | 22nd Annual Conference of the International Group for Lean Construction |
---|---|
Abbreviated title | IGLC 2014 |
Country/Territory | Norway |
City | Oslo |
Period | 25/06/14 → 27/06/14 |