Multiple Pantograph Interaction With Catenaries in High-Speed Trains

Joao Pombo, Jorge Ambrsio

Research output: Contribution to journalArticle

28 Citations (Scopus)

Abstract

The limitation on the top velocity of high-speed trains concerns the ability to supply the proper amount of energy required to run the engines through the catenary-pantograph interface. Due to the loss of contact, not only the energy supply is interrupted, but also arching between the collector bow of the pantograph and the contact wire of the catenary occurs, leading to the deterioration of the functional conditions of the two systems. An alternative would be to increase the contact force between the two systems. But such force increase would lead to a rapid wear of the contact strip of the pantograph and of the contact wire with negative consequences on the durability of the systems. These situations require that the dynamics of the pantograph-catenary are properly modeled and that software used for analysis, design, or to support maintenance decisions is not only accurate and efficient, but also allows for modeling all details relevant to the train overhead energy collector operation. This work presents a fully three-dimensional methodology for the computational analysis of the interaction between catenary and pantographs. The finite element method (FEM) is used to support the modeling of the catenary, while a multibody (MB) dynamics methodology is applied to support the pantograph modeling. The contact between the two subsystems is described using a penalty contact formulation. A high-speed co-simulation procedure is proposed to ensure the communication between the two methodologies. In order to validate the formulation and models developed, the numerical results are compared against experimental data. The proposed methodology is then applied to study the interaction of multiple pantographs of a high-speed train with the catenary. The results show that the passage of the front pantograph excites the catenary, leading to the deterioration of the contact conditions on the rear one.

Original languageEnglish
Article number041008
JournalJournal of Computational and Nonlinear Dynamics
Volume7
Issue number4
DOIs
Publication statusPublished - 17 Sep 2012
Externally publishedYes

Fingerprint

Pantograph
Pantographs
Catenary
High Speed
Contact
Interaction
Methodology
Deterioration
Energy
Modeling
Wire
Co-simulation
Multibody Dynamics
Formulation
Contact Force
Computational Analysis
Durability
Strip
Penalty
Subsystem

Cite this

@article{13d139c72f4e47b1b24375dbacc6a691,
title = "Multiple Pantograph Interaction With Catenaries in High-Speed Trains",
abstract = "The limitation on the top velocity of high-speed trains concerns the ability to supply the proper amount of energy required to run the engines through the catenary-pantograph interface. Due to the loss of contact, not only the energy supply is interrupted, but also arching between the collector bow of the pantograph and the contact wire of the catenary occurs, leading to the deterioration of the functional conditions of the two systems. An alternative would be to increase the contact force between the two systems. But such force increase would lead to a rapid wear of the contact strip of the pantograph and of the contact wire with negative consequences on the durability of the systems. These situations require that the dynamics of the pantograph-catenary are properly modeled and that software used for analysis, design, or to support maintenance decisions is not only accurate and efficient, but also allows for modeling all details relevant to the train overhead energy collector operation. This work presents a fully three-dimensional methodology for the computational analysis of the interaction between catenary and pantographs. The finite element method (FEM) is used to support the modeling of the catenary, while a multibody (MB) dynamics methodology is applied to support the pantograph modeling. The contact between the two subsystems is described using a penalty contact formulation. A high-speed co-simulation procedure is proposed to ensure the communication between the two methodologies. In order to validate the formulation and models developed, the numerical results are compared against experimental data. The proposed methodology is then applied to study the interaction of multiple pantographs of a high-speed train with the catenary. The results show that the passage of the front pantograph excites the catenary, leading to the deterioration of the contact conditions on the rear one.",
keywords = "Contact Forces, Multibody Systems, Pantograph-Catenary Interaction, Railway Dynamics",
author = "Joao Pombo and Jorge Ambrsio",
year = "2012",
month = "9",
day = "17",
doi = "10.1115/1.4006734",
language = "English",
volume = "7",
journal = "Journal of Computational and Nonlinear Dynamics",
issn = "1555-1423",
publisher = "American Society of Mechanical Engineers (ASME)",
number = "4",

}

Multiple Pantograph Interaction With Catenaries in High-Speed Trains. / Pombo, Joao; Ambrsio, Jorge.

In: Journal of Computational and Nonlinear Dynamics, Vol. 7, No. 4, 041008, 17.09.2012.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Multiple Pantograph Interaction With Catenaries in High-Speed Trains

AU - Pombo, Joao

AU - Ambrsio, Jorge

PY - 2012/9/17

Y1 - 2012/9/17

N2 - The limitation on the top velocity of high-speed trains concerns the ability to supply the proper amount of energy required to run the engines through the catenary-pantograph interface. Due to the loss of contact, not only the energy supply is interrupted, but also arching between the collector bow of the pantograph and the contact wire of the catenary occurs, leading to the deterioration of the functional conditions of the two systems. An alternative would be to increase the contact force between the two systems. But such force increase would lead to a rapid wear of the contact strip of the pantograph and of the contact wire with negative consequences on the durability of the systems. These situations require that the dynamics of the pantograph-catenary are properly modeled and that software used for analysis, design, or to support maintenance decisions is not only accurate and efficient, but also allows for modeling all details relevant to the train overhead energy collector operation. This work presents a fully three-dimensional methodology for the computational analysis of the interaction between catenary and pantographs. The finite element method (FEM) is used to support the modeling of the catenary, while a multibody (MB) dynamics methodology is applied to support the pantograph modeling. The contact between the two subsystems is described using a penalty contact formulation. A high-speed co-simulation procedure is proposed to ensure the communication between the two methodologies. In order to validate the formulation and models developed, the numerical results are compared against experimental data. The proposed methodology is then applied to study the interaction of multiple pantographs of a high-speed train with the catenary. The results show that the passage of the front pantograph excites the catenary, leading to the deterioration of the contact conditions on the rear one.

AB - The limitation on the top velocity of high-speed trains concerns the ability to supply the proper amount of energy required to run the engines through the catenary-pantograph interface. Due to the loss of contact, not only the energy supply is interrupted, but also arching between the collector bow of the pantograph and the contact wire of the catenary occurs, leading to the deterioration of the functional conditions of the two systems. An alternative would be to increase the contact force between the two systems. But such force increase would lead to a rapid wear of the contact strip of the pantograph and of the contact wire with negative consequences on the durability of the systems. These situations require that the dynamics of the pantograph-catenary are properly modeled and that software used for analysis, design, or to support maintenance decisions is not only accurate and efficient, but also allows for modeling all details relevant to the train overhead energy collector operation. This work presents a fully three-dimensional methodology for the computational analysis of the interaction between catenary and pantographs. The finite element method (FEM) is used to support the modeling of the catenary, while a multibody (MB) dynamics methodology is applied to support the pantograph modeling. The contact between the two subsystems is described using a penalty contact formulation. A high-speed co-simulation procedure is proposed to ensure the communication between the two methodologies. In order to validate the formulation and models developed, the numerical results are compared against experimental data. The proposed methodology is then applied to study the interaction of multiple pantographs of a high-speed train with the catenary. The results show that the passage of the front pantograph excites the catenary, leading to the deterioration of the contact conditions on the rear one.

KW - Contact Forces

KW - Multibody Systems

KW - Pantograph-Catenary Interaction

KW - Railway Dynamics

UR - http://www.scopus.com/inward/record.url?scp=84865865101&partnerID=8YFLogxK

U2 - 10.1115/1.4006734

DO - 10.1115/1.4006734

M3 - Article

VL - 7

JO - Journal of Computational and Nonlinear Dynamics

JF - Journal of Computational and Nonlinear Dynamics

SN - 1555-1423

IS - 4

M1 - 041008

ER -