Abstract
The word plan is in English both a verb and a noun, reminding us that to plan is a process resulting in a product, a plan. While the Last Planner System (LPS) is primarily focused on how to plan and control production, other planning concepts are more focused on the plan contents (the plan). A more explicit approach to the characteristics of a good plan could improve LPS as a planning concept. The paper proposes such a list, based on a discussion of the plan contents highlighted by the following planning concepts: Critical Path, the Location-Based Management System, Takt Planning, Critical Chain, Agile, Task Planning and the Last Planner System.
Original language | English |
---|---|
Title of host publication | Proceedings of IGLC 23 - 23rd Annual Conference of the International Group for Lean Construction: Global Knowledge - Global Solutions |
Publisher | The International Group for Lean Construction |
Pages | 93-102 |
Number of pages | 10 |
ISBN (Electronic) | 9780987455796 |
Publication status | Published - 2015 |
Event | 23rd Annual Conference of the International Group for Lean Construction - Perth, Australia Duration: 28 Jul 2015 → 31 Jul 2015 Conference number: 23 |
Conference
Conference | 23rd Annual Conference of the International Group for Lean Construction |
---|---|
Abbreviated title | IGLC 23 |
Country/Territory | Australia |
City | Perth |
Period | 28/07/15 → 31/07/15 |